Godfrey Bloom: The whole wind turbine game is a SCAM

A 2-megawatt wind turbine requires 200 tonnes of steel, which needs 300 tonnes of iron and 170 tonnes of coking coal.  The coal, and other raw materials, have to be mined and transported by hy…

https://expose-news.com/2024/10/02/the-whole-wind-turbine-game-is-a-scam/